The foundation walls are poured.
The subsurface plumbing and electric is installed and the slab subbase is prepped.
The concrete slab is poured.
The septic field is built.
Please continue to check both the “Home Page” and the “What’s New!” sections of Barnside Veterinary Hospital’s web site. Information will be added and updated regularly.